Thursday, July 20, 2017

TO: Board of Selectmen
FROM: Carter Terenzini, Town Administrator
RE: Administrator’s Weekly Report
DATE: July 19, 2017
CC: All Departments

Weekly Report: Weekly Report: I have some excellent news to share on the elementary school project. As you know there were some modest redesigns required to address changes in the energy code. As you also know we had the cost estimator run new numbers to see where we stood given this redesign and the one year delay. The OPM reports that “We are confirmed that estimates are positive overall and the project remains on target slightly under the original budget with the added year of inflation and the added SMMA and OPM costs. We plan to keep the add alternates as originally anticipated in the bid documents to allow the district to add elements if desired and have the safety of the FF&E if bids were to come in significantly over budget.” I’ve been working with counsel on our litigation matters as you will see on 07/24. I’ve provided comment on the several IMA drafts and have started a Transition Memorandum for Mr. Hickey.
Administration & Finance:
 Town Accountant: Nothing to report this week.
Treasurer/Collector: Nothing to report this week

Public Works Highway Department:
Highway personal assisted the water department with some excavation on Prospect Street. A flashing “STOP” sign was placed @ the end of Barre Road where it meets Dudley Road. Many accidents have occurred and this is part of an effort to keep the public safe. Some catch basins addressed for blockages and the lines flushed to clear debris. Cold patching done on South Road. Narragansett parking lines were re-painted and the Baldwinville Elementary. Sweeping should be complete by the end of this week. One of the COA vans is in the process of being repaired for power steering issues, and is expected to be available by 7/21/17. H7 is back in the fleet. H23, the bucket truck is in the process of being torn down and engine rebuilt.

Buildings & Grounds: The director has been compiling info for the Tomb grant. Trimming and mowing was done @ Green Lawn and Pine Grove. Prepared area for a funeral in Green Lawn cemetery. The crew assisted at the Senior Center in setting up for an outside event. Picnic tables and trash barrels were supplied. Picked up materials at Graves concrete and Agway for use in the cemeteries and commons. All common areas mowed and trimmed and the trash emptied. General maintenance to the lawn tractors and other equipment.