Friday, June 23, 2017

from the Town Administrator report of 6/22/2017


n. After checking with your various schedules for availability I have scheduled a joint meeting with the Winchendon BoS for 07/27 at 7p in Winchendon Town Hall to discuss the opportunities for programmatic and management sharing.


Public Works Highway Department: Removed branches, stumps and loamed/seeded where trees were cut. The brush mower continues to mow road side areas thru out town. Re-Patched the pot hole under the bridge on Central St., water seems to be under mining the patch. We also patched in various other areas on Brooks Rd. and Baldwinville Rd. The Sweeper worked in the area of Barre Rd, Harley Hill, Henshaw and Stone Bridge, and continued to Minuteman and Musket. Approximately 15 Ton of milling put out on Claire Dr. to help even out the roughness in the road. This effort will continue as the winter took its toll on the surface of the road. The director attended the conservation meeting on Monday night to address the situation on Cottage lane. On Tuesday Alan attended the Elementary school meeting seeking info on the ONE WAY and RADIUS changes. Parts for the H7 and H9 ten wheelers are on hand and those two vehicles should be returned to the fleet. Alan reached out to the Light and Water department about obtaining their used bucket truck to replace the one that is out of service @ the highway barn. The meeting was positive in respect to the light and water will be upgrading in the Spring and would be open to surplus their 2006 to the highway department in the spring. The options to repair the 2001 truck are expensive, New motor ~$12,000.00, Rebuilt out sourced ~$8,000.00 and rebuild in-house ~$2000. Since the feeling from the Light & Water department is favorable that they would surplus the 2006 to us, we will be putting a small amount ($2k+/-) into the truck to get it running. This bucket truck is vital to highway for emergency storm and tree related issues.



posted by Jeff Bennett

No comments:

Post a Comment